Product Details
The inner surface walls will be fixed to the bricks wall with essential supports. There will be minimum possible cavity/gap in between the solid and steel walls. The total distance between the inside and outside surfaces of the operating room will be variable to suit the architect's layout. But will be sufficient for the flush mounting of equipments. The individual wall panels will be spot welded together at equal intervals to render equal support to the panels. Spot welding will be properly grinded to make the surface leveled.
Features:
You need to Sign in to view this feature
This address will be removed from this list